Expansion 2.0: Northwest cluster
This is a schematic representation of the current building lots. It is not possible to derive eligible addresses from the illustration. The City of Chemnitz is under no obligation to develop all addresses within the subsidised areas or construction areas.
| Start of construction: | 03.03.2025 |
| Planned end of construction: | IV/2028 |
| Address points to be developed: | 2.696 |
| Estimated total costs: | € 36.88 million |
| Expected funding (federal/state): | € 33.19 million |
| Expected own funds City of Chemnitz: | € 3.69 million |
| Operator / leaseholder: | eins energie in sachsen GmbH & Co KG |
| Planned start of lease: | 01.01.2029 |
| Planned end of lease: | 31.12.2035 |
| Technology used: | FTTB |
| Supply speed (target): | at least 1,000 Mbit/s |
Progress of the building works
Explanatory notes on the construction progress tables:
Construction completed
Refers to network distribution areas in which domestic connections have already been installed. Completion of construction does not yet mean the network is operational, as work may still be required on the upstream network. Operational (sub-)areas will be published separately upon completion.
Operational
The relevant network distribution area has been approved by the City of Chemnitz. This means that both the civil engineering works and the installation of the fibre-optic cables up to the fibre-optic termination point have been completed. The next stage involves the installation of the in-building fibre-optic cabling by contractors commissioned by eins energie in sachsen GmbH & Co. This may take several weeks. Individual customer activations are possible at any time once the roll-out of network level 4 has been completed for the relevant address.
in operation
The entire network distribution area is now operational, and individual customer activations can take place depending on the progress of the in-building fibre-optic cabling by eins energie in sachsen GmbH & Co. GmbH. Further information on availability can be found at www.eins.de.
| Planning | Under construction | Construction completed | Operational | in operation | |
|---|---|---|---|---|---|
| Point of Presence 38 | |||||
| Network distribution point 38.2 Friedhofstraße; Robert-Blum-Straße; Zwickauer Straße | in planning | Under construction | |||
| Distribution substation 38.4 Färbergasse; Gustav-Wünsch-Straße; Zwickauer Straße | in planning | ||||
| Network distribution point 38.6 Eichelbergweg; Gustav-Wünsch-Straße; Walthergasse; Zwickauer Straße | in planning | ||||
| Network distribution point 38.8 Bahnstraße; Carl-Hertel-Straße; Mühlgasse; Popowstraße; Zwickauer Straße | in planning | ||||
| Network distribution point 38.9 Einsteinstraße; Mühlgasse; Zwickauer Straße | in planning | ||||
| Distribution substation 38.10 Kohlstraße; Zwickauer Straße | in planning | ||||
| Distribution substation 38.11 Am Feldschlößchen; Steinstraße; Zwickauer Straße | in planning | ||||
| Distribution substation 38.13 Goethestraße; Herberstraße; Lützowstraße; Zwickauer Straße | in planning | under construction | |||
| Point of Presence 41 | |||||
| Network distribution point 41.4 Kaufmannstraße; Meyerstraße; Oberfrohnaer Straße | planned | ||||
| Distribution substation 41.6 Nevoigtstraße | in planning | under construction | |||
| Distribution substation 41.7 Am Unritzbach; Nevoigtstraße; Unritzstraße | in planning | under construction | |||
| Distribution substation 41.8 An den alten Lehden; Pelzmühlenstraße; Rabensteiner Straße; Unritzstraße | in the planning stage | under construction | |||
| Network distribution point 41.11 Bauernweg; Riedbachweg; Riedstraße; Unritzstraße | In planning | Under construction | |||
| Distribution substation 41.13 Boettcherstraße; Kalkstraße; Oberfrohnaer Straße; Pelzmühöenstraße; Trützschlerstraße; Wilhelm-Wolff-Straße | in planning | ||||
| Point of Presence 42 | |||||
| Network distribution area 42.1 Am alten Weinberg; Rabensteiner Straße; Riedstraße; Schaftreiberweg | in planning | under construction | |||
| Distribution area 42.2 Rabensteiner Straße; Teichstraße | in planning | ||||
| Distribution area 42.3 Am Bretteich; Am Poltermühlenteich; Dorfstraße; Grenzweg; Ringstraße | in planning | under construction | |||
| Distribution area 42.4 Dorfstraße; Mühlenstraße; Ringstraße | in planning | under construction | |||
| Distribution network area 42.6 Bachgasse; Dorfstraße; Limbacher Straße | In planning | ||||
| Network distribution area 42.9 Am Hexenberg; Dornröschenweg; Limbacher Straße | in planning | under construction | construction completed | ||
| Network distribution area 42.11 Drachenweg; Limbacher Straße; Rabensteiner Straße; Röhrsdorfer Straße | in planning | under construction | Construction completed | ||
| Point of Presence 43 | |||||
| Network distribution area 43.19 Baumgartenstraße; Lessingstraße; Lutherstraße | in planning | under construction | Construction completed | ||
| Distribution substation area 43.22 Totenstein | in planning | under construction | |||
| Point of Presence 44 | |||||
| Network distribution area 44.5 Dorfbachgasse; Kieselhausenstraße; Limbacher Straße; Sandsteig | in planning | under construction | |||
| Distribution substation area 44.6 Kieselhausenstraße | in planning | under construction | |||
| Network distribution area 44.10 Boettcherstraße; Georgenkirchweg; Harthweg | in planning | ||||
| Distribution area 44.24 Ahnertstraße; Antonstraße; Oberfrohnaer Straße; Riedstraße | in planning | under construction | |||
| Distribution substation area 44.25 Am Kalkwiesenteich; Antonstraße; Georgenkirchweg | in planning | under construction | |||
| Network distribution area 44.28 Georgenkirchweg; Georg-Weerth-Straße; Rittergutsweg | in planning |
| Planning | Under construction | Construction completed | Operational | in operation | |
|---|---|---|---|---|---|
| Point of Presence 45 | |||||
| Network distribution point 45.1 Nordstraße; Röhrsdorfer Allee | in planning | under construction | construction completed | ||
| Distribution substation 45.7 Emile-Zola-Straße; Leipziger Straße; Siedlungsweg; Wildparkgasse | In the planning stage | under construction | |||
| Network distribution point 45.11 Leipziger Straße; Querstraße; Wildparkstraße | In planning | Under construction | |||
| Network distribution point 45.12 Beethovenweg; Chemnitzer Straße; Genossenschaftsweg | in planning | ||||
| Distribution substation 45.13 Am Pleißenbach; Chemnitzer Straße; Eichenweg; Genossenschaftweg; Goetheweg; Lindenweg; Theodor-Körner-Straße | in planning | ||||
| Distribution substation 45.14 Am Strauchhof; Chemnitzer Straße; Genossenschaftsweg; Goetheweg; Holzfällerweg | in planning | ||||
| Distribution substation 45.15 Beethovenweg; Chemnitzer Straße; Heinrich-Heine-Straße | in planning | ||||
| Distribution substation 45.16 Beethovenweg; Chemnitzer Straße; Heinrich-Heine-Straße; Mozartweg; Schulgasse; Schulstraße | in planning | ||||
| Distribution substation 45.18 Chemnitzer Straße; Goetheweg; Limbacher Straße; Rabensteiner Straße; Rathausplatz | in planning | ||||
| Network distribution point 45.20 Beethovenweg; Kirchberg; Limbacher Straße; Schillergasse; Sebastian-Bach-Gasse | in planning | ||||
| Network distribution point 45.21 Goetheweg; Limbacher Straße | in planning | under construction | |||
| Distribution substation 45.23 Goetheweg; Jack-London-Straße; Limbacher Straße | in planning | under construction | |||
| Distribution substation 45.24 Am Ludwigshof; Beethovenweg; Goetheweg; Limbacher Straße | In planning | under construction | construction completed | ||
| Distribution substation 45.25 Goetheweg; Gutsweg; Limbacher Straße; Wasserschänkenstraße | In planning | under construction | construction completed | ||
| Network distribution point 45.26 Beethovenweg; Wasserschänkenstraße | In planning | under construction | construction completed | ||
| Distribution substation 45.27 Leipziger Straße; Wasserschänkenstraße | in planning | under construction | construction completed | ||
| Network distribution point 45.29 Goetheweg; Haardt; Limbacher Straße; Löbenhainer Straße | In planning | under construction | construction completed | ||
| Distribution substation 45.30 Goetheweg; Haardt | in planning | under construction | Construction completed | ||
| Point of Presence 47 | |||||
| Network distribution point 47.4 Auerswalder Straße; Bornaer Straße; Wittgensdorfer Straße | in planning | under construction | |||
| Distribution substation 47.6 Hölderlinstraße; Rilkestraße; edge of the wood | in planning | under construction | construction completed | ||
| Distribution substation 47.7 Hölderlinstraße; Saarstraße; edge of the wood | in planning | under construction | Construction completed | ||
| Distribution substation 47.10 Am Küchwald; Küchwaldring; Salzstraße; Sechserweg; Waldrand | In planning | under construction | |||
| Distribution substation 47.12 Wittgensdorfer Straße | in planning | under construction | |||
| Distribution substation 47.14 Leipziger Straße; Paracelsusstraße; Wittgensdorfer Straße | in planning | under construction | |||
| Network distribution point 47.15 Leipziger Straße; Louis-Otto-Straße | in planning | under construction | |||
| Point of Presence 48 | |||||
| Network distribution area 48.1 Chemnitzer Straße; Kornweg; Wittgensdorfer Straße | in planning | under construction | construction completed |