Expansion 2.0: Cluster East

This is a schematic representation of the current building lots. It is not possible to derive eligible addresses from the illustration. The City of Chemnitz is under no obligation to develop all addresses within the subsidised areas or construction areas.

Übersicht Fördergebiet Ost
Picture: Stadt Chemnitz / TKI
Start of construction:October 2025
Planned completion date:December 2029
Number of properties to be connected:4.154
Estimated total cost:€46.94 million
Estimated funding (federal/state):€42.25 million
Estimated own funds from the City of Chemnitz:€4.69 million
Operator / Lessee:eins energie in sachsen GmbH & Co. KG
Planned start of lease:1 January 2030
Planned end of lease:3112 December 2036
Technology used:FTTB
Service speed (target):at least 1,000 Mbit/s

Contract lots 2 and 3

AYTAC Bau GmbH logo

Contract Lot 4

'Swing & Cut' logo

Lot 6

EIFFAGE Infra-Bau logo

Contract Lot 10

RAC logo

Progress of the building works

Explanatory notes on the construction progress tables:

Construction completed
Refers to network distribution areas in which domestic connections have already been installed. Completion of construction does not yet mean the network is operational, as work may still be required on the upstream network. Operational (sub-)areas will be published separately upon completion.

Operational
The relevant network distribution area has been approved by the City of Chemnitz. This means that both the civil engineering works and the installation of the fibre-optic cables up to the fibre-optic termination point have been completed. The next stage involves the installation of the in-building fibre-optic cabling by contractors commissioned by eins energie in sachsen GmbH & Co. This may take several weeks. Individual customer activations are possible at any time once the roll-out of network level 4 has been completed for the relevant address.

in operation
The entire network distribution area is now operational, and individual customer activations can take place depending on the progress of the in-building fibre-optic cabling by eins energie in sachsen GmbH & Co. GmbH. Further information on availability can be found at www.eins.de.

 PlanningUnder constructionConstruction completedOperationalin operation
Point of Presence 14     
Network distribution point 14.2
Adalbert-Stifter-Weg; On the Riesa railway line; Further Höhe; Glösaer Straße
in planning    
Network distribution point 14.6
Am Schnellen Markt; Frankenberger Straße; Herwehgstraße; Lichtenwalder Straße
in planning    
Distribution substation 14.9
Ebersdorfer Straße; Frankenberger Straße; Krügerstraße
in planning    
Distribution substation 14.11
Agricolastraße; Frankenberger Straße; Glösaer Straße; Huttenstraße;
Lichtenwalder Straße
in planning    
      
Point of Presence 15     
Network distribution point 15.9
Eberhardtsteig; Mittweidaer Straße; Silchstraße
in planning    
Network distribution point 15.12
Mittweidaer Straße
In planning    
Distribution substation 15.13
Mittweidaer Straße
in planning    
Distribution substation 15.16
Mittweidaerstraße; Ortelsdorfer Straße
in planning    
Distribution substation 15.17
Ortelsdorfer Straße
in planning    
Network distribution point 15.18
Ebersdorfer Höhe; Frankenberger Straße
in planning    
Distribution substation 15.19
Max-Saupe-Straße
PlannedUnder construction   
Network distribution point 15.20
On the Riesa railway line; Tännichtleite
in planningunder construction   
Network distribution point 15.21
At the bend; On the Riesa railway line; Stiftsweg
in planningunder construction   
Network distribution point 15.22
At the bend; Stiftsweg
in planningunder construction   
 PlanningUnder constructionConstruction completedOperationalin operation
Point of Presence 13     
Network distribution point 13.1
Blankenauer Straße; Chemnitztalstraße
in planning    
      
Point of Presence 16     
Network distribution point 16.1
Emilienstraße; Frankenberger Straße
in planning    
Distribution substation 16.2
On the Riesa railway line
in planning    
Network distribution point 16.3
Dresdner Straße: Forststraße; Hohlweg
in planning    
Distribution substation 16.4
August-Bebel-Straße; Dresdner Straße; Palmstraße; Thomas-Mann-Platz
in planning    
Network distribution point 16.5
Dresdner Straße; Forststraße; Gellertstraße; Hainstraße; Palmstraße; 
Zietenstraße
in planning    
Distribution substation 16.6
Heinrich-Schütz-Straße; Hofer Straße; Paul-Gerhardt-Straße; Planitzwiese
in planning    
 PlanningUnder constructionConstruction completedOperationalin operation
Point of Presence 6     
Network distribution point 6.1
Main road
in planning    
      
Point of Presence 7     
Network distribution centre 7.3
Hugo-Pöschmann-Straße
in planning    
Distribution substation 7.6
Mittagleite
in planning    
Network distribution point 7.20
Marktsteig, Mittagleite
in planningunder construction   
      
Point of Presence 18     
Network distribution area 18.1
Eubaer Straße
in planning    
Distribution area 18.3
Augustusburger Straße, Eubaer Straße
In planning    
Distribution substation area 18.3
Augustusburger Straße, Eubaer Straße
In planning    
Distribution area 18.5
Olbersdorfer Straße
in planning    
Distribution substation area 18.10
Adelsbergstraße
in planning    
Network distribution area 18.17
Dreiserstraße
in planning    
Network distribution area 18.19
Reinhard-Uhlig-Straße
in planning    
Distribution area 18.21
Cervantesstraße
in planning    
Distribution substation area 18.23
Cervantesstraße
in planning    
      
Point of Presence 19     
Network distribution area 19.2
Dreiserstraße, Georgistraße
in planning    
Distribution substation area 19.6
Georgistraße
in planning    
Network distribution area 19.7
Barbussestraße, Kleiner Weg, Otto-Thörner-Straße
in planning    
Distribution area 19.8
Adelsbergstraße, Breitenlehn, Kirchwinkel
in planning    
Distribution substation area 19.10
Adelsbergweg, Breitenlehn
in planning    
Distribution substation area 19.11
Adelsbergstraße
in planning    
Distribution network area 19.12
Adelsbergstraße; Hermersdorfer Straße; Kleinolbersdorfer Straße
in planning    
Distribution network area 19.13
Am Schösserholz
In planningUnder construction   
Distribution substation area 19.14
Am Schösserholz
in planning    
Network distribution area 19.31
Spürweg
in planning    
      
Point of Presence 20     
Network distribution area 20.4
Marktsteig, Richterweg
in planning    
Distribution area 20.11
Gornauer Straße
in planningunder constructionconstruction completed  
Network distribution area 20.12
Gornauer Straße
in planning    
Network distribution area 20.13
Reichenhainer Mühlberg
in planning    
Distribution area 20.14
Reichenhainer Mühlberg
in planningunder constructionconstruction completed  
Distribution substation area 20.15
Reichenhainer Mühlberg
in planningunder construction   
Distribution substation area 20.17
Erfenschlager Straße
in planning    
Distribution substation area 20.21
Sayder Straße
in planningunder construction   
 PlanningUnder constructionConstruction completedOperationalin operation
Point of Presence 9     
Network distribution point 9.5
Zum Spitzberg; Altenhainer Dorfstraße
in planning    
      
Point of Presence 22     
Network distribution point 22.1
Bernhard-Kuhnt-Weg; Schöne Aussicht; Zschopauer Straße
in planningunder construction   
Network distribution point 22.2
Bernhard-Kuhnt-Weg; Lehmgrubenweg; Max-Brand-Straße
in planningunder construction   
Network distribution point 22.3
Am Gehege; Gartenstadt
in planning    
Distribution substation 22.6
Ferdinandstraße; Schillerstraße
in planning    
Distribution substation 22.14
Am Finsterbusch; Ferdinandstraße
in planning    
Distribution substation 22.15
Ferdinandstraße
in planning    
Distribution substation 22.16
Shakespearstraße; Zschopauer Straße
in planning    
Distribution substation 22.18
Altenhainer Dorfstraße; Zschopauer Straße
in planning    
Distribution substation 22.20
Einsiedler Weg; Zschopauer Straße
in planningunder construction   
Distribution substation 22.21
Altenhainer Dorfstraße; Am Winkel; Einsiedler Weg
in planning    
Distribution substation 22.22
Altenhainer Dorfstraße; Baumeister-Uhlig-Straße
in planning    
Network distribution point 22.23
Altenhainer Dorfstraße; Zum Spitzberg
in planning    
 PlanningUnder constructionConstruction completedOperationalin operation
Point of Presence 1     
Network distribution point 1.2
Untere Hauptstraße; Waldweg
in planning    
Distribution substation 1.16
Upper Main Street
in planning    
Distribution substation 1.28
Querweg
in planning    
      
Point of Presence 49     
Network distribution point 49.1
Bornaer Straße; Sandstraße
in planning    
Distribution substation 49.2
Auerswalder Straße; Bornaer Straße
planned    
Distribution substation 49.3
Auerswalder Straße; Hermann-Löns-Straße
in planning    
Distribution substation 49.5
Damaschkestraße; Hermann-Löns-Straße
in planningunder construction   
Network distribution point 49.6
Bornaer Straße; Damaschkestraße; Heinersdorfer Straße
In planning    
Distribution substation 49.7
An der Hofewiese; Blankenburgstraße; Bornaer Straße
planned    
Distribution substation 49.8
Bornaer Straße; Sandstraße
in planning    
Distribution substation 49.9
In der Delle; Draisdorfer Straße; Blankenburgstraße
in planningunder construction   
Distribution board 49.10
Draisdorfer Straße; Zu den Pappeln
in planningunder construction   
Distribution board 49.11
Draisdorfer Straße; In der Delle
in planning    
Network distribution point 49.12
Blankenburgstraße; Draisdorfer Straße
in planning    
Distribution substation 49.13
Glücksberg; In der Delle
in planningunder construction   
Distribution substation 49.14
Glücksberg; In der Delle
in planning    
      
Point of Presence 50     
Network distribution point 50.1
Am Bahrehang
in planningunder construction   
Distribution substation 50.2
Heinersdorfer Straße
in planning    
Distribution substation 50.3
Am Bahrebach; Heinersdorfer Straße
in planning    
Distribution substation 50.6
Am Bahrehang; Zum Kornweg
in planning    
Distribution substation 50.7
Am Bahrehang
in planningunder construction   
      
Point of Presence 51     
Network distribution point 51.1
Chemnitztalstraße
in planning    
      
Point of Presence 52     
Network distribution point 52.2
Chemnitztalstraße; Untere Hauptstraße; Waldweg 1
in planning