The property at Zschopauer Straße 63/65 was built on with former production buildings from the Gründerzeit. Due to the intensive use of the production facilities in the 20th century, the site was contaminated.

No renovation or modernisation work has been carried out on the buildings since they were abandoned. As a result, the buildings were in a poor structural condition and could no longer be used.

The revitalisation measures include the demolition of the buildings and the unsealing of the site.

The revitalised site is intended to extend the adjacent Park of the Victims of Fascism.

Measure:

Clearance of the property at Zschopauer Straße 63/65

Project organiser:

City of Chemnitz

Project duration:

11 July 2011 - 30 June 2014

Costs:

82,546.55 euros

of which funding:

61,909.91 euros

Project status:

Completed